Long Island Live Steamers, Southaven Park Long Island, The Best kept secret of Long Island lilivesteam mailto members about long island live steam LI Live Steamers Events Visitors to Long Island Live Steamers Long Island Live Steamers Store LI Live Steamers History Track Plan at Long Island Live Steamers Long Island Live Steamers Photo Gallery LI Live Steamers Media and Press Directions to Long Island Live Steamers
Long Island Live Steamers, Southaven Park Long Island, The Best kept secret of Long Island
The next scheduled
Public Run Day
can be found
by
CLICKING HERE!

Come early and stay late, but plan now for a great family day of Train Riding Action.

Long Island Live Steamers Membership information and Members Only Area
LI Live Steamers operations are all outdoors and are dependent upon reasonable weather for safe operation. Always check the weather before making your way to the track.


Hot Stations and Hotter Cars: The Subways - Cont.

Looking out the front window you got an education on the signal and track systems. You see an abundance of signal boxes showing red, yellow and green lights. The subway signals are not a passive signal but an aggressive one. On each subway car truck there are two trip bars hanging down. Directly next to the track rail is another trip bar, about 12 inches high, in the shape ofa'T". Each trip is connected to a signal box. If the trip is straight up, the signal is red, if it is down or going down its either yellow or green. If the truck trip bar hits the "T" bar on the track, the train brakes automatically engage. And do they ever.

They are set in series based on speed, track changes and other conditions. If there is an occasion for a red signal to be bypassed, the engineer must call the tower and then get permission to "key" into that signal to bypass. The signal system is designed to cover all variables to avoid any collusions or derailments. When coming to a switch, there were always a couple of sets of signals protecting the tracks from both directions.
The track roadbeds could vary. On the EL the tracks were laid across and secured to steel cross beams, on the concrete EL's or embankments or on the ground they were laid on a roadbed of gravel. In the underground subway they could be laid on a gravel roadbed or set in a concrete pad with a drain running down the middle of the track. There always were a few sections of unused rail lying between the tracks. Continued Next Page - Click Here.
Our Public Run days are usually scheduled for the second and last Sundays of the month from May through October.